Simulation subprocess

by Mr. hugo Calsin (2011-10-19) in group We Love BPM

Hi all:

I'm doing the simulation of Subprocess  that contain pools and the following occurs:

In the following model,  the simulation is done correctly,  ie the sequence of the simulation is started from the event 1 , after that  go to  message end event then  starts with the message start event.

Fig 1

 

but the next model uses a subprocess associate to model 1(Fig 1), the tool(Oracle bpa ) simulates the subprocess starting  both events simultaneously (Fig 1 Event 1 and Message start event) and at the end of the simulation throws the following error:

 

"Message start event" in "Model 1": Unable to find an incoming message flow for the object.
"Message end event" "Pool": Unable to find an outgoing message flow for the object.
 
 
Fig 2
 
My question is there a setting to simulate the Fig 2 so that the "Model 1" process runs without throwing the two events at once, ie  starts with event 1 and continue the flow of events through message events?
 
Thanks for your help

 

 


Comments

by Mr. Ralf Angeli (2011-10-19)

The behavior you are seeing is due to a bug which was fixed in ARIS 7.2.


by Mr. hugo Calsin (2011-10-19)

Hi Mr Ralf  Thanks for your answer

 

I'm using oracle BPA 11gr1 , could you explain me more about the bug? or how I can simulate this scenario?

 

Thanks for your help 


by Mr. Ralf Angeli (2011-10-20)

If possible I'd update the installation of the BPA Suite to the most recent version. As far as I know there are versions of the BPA Suite which are based on ARIS 7.2. In the readme file of such a version you should find something like the following string "Readme for Oracle BPA Suite 11gR1 based upon ARIS 7.2.0.xxxxxx".